[1]
Majer, R. and Gregorová, V. 2018. ANALYSIS OF THE IMPACT OF THE SELECTION OF THE TECHNOLOGY OF THE FOLLOW-UP ASSEMBLY IN THE TIME OF TIME AND THE FINANCIAL COSTS. Czech Journal of Civil Engineering. 4, 1 (Jun. 2018), 65-71. DOI:https://doi.org/10.51704/cjce.2018.vol4.iss1.pp65-71.