Majer, R., & Gregorová, V. (2018). ANALYSIS OF THE IMPACT OF THE SELECTION OF THE TECHNOLOGY OF THE FOLLOW-UP ASSEMBLY IN THE TIME OF TIME AND THE FINANCIAL COSTS. Czech Journal of Civil Engineering, 4(1), 65–71. https://doi.org/10.51704/cjce.2018.vol4.iss1.pp65-71