Majer, Radovan, and Valéria Gregorová. 2018. “ANALYSIS OF THE IMPACT OF THE SELECTION OF THE TECHNOLOGY OF THE FOLLOW-UP ASSEMBLY IN THE TIME OF TIME AND THE FINANCIAL COSTS”. Czech Journal of Civil Engineering 4 (1):65-71. https://doi.org/10.51704/cjce.2018.vol4.iss1.pp65-71.