THE UNPREDICTABLE COSTS PART OF CONSTRUCTION

Authors

  • Silvia Ďubek Slovak University of Technology in Bratislava, Faculty of Civil Engineering, Radlinského 11, 81005 Bratislava, Slovakia
  • Marek Ďubek Slovak University of Technology in Bratislava, Faculty of Civil Engineering, Radlinského 11, 81005 Bratislava, Slovakia

Keywords:

Coefficient, construction site equipment, unpredictable costs

Abstract

Nowadays, there are no surprise occurring increasing unplanned costs or unpredictable costs incurred during construction. Possible causes of are usually caused by inadequate preparation of project documentation at the stage before realization construction work, because often lies importance, especially for the lowest price of the project and in the choice of the designer. Poorly finished project is one of the reasons for increasing costs to remove the problems of works. The problems may be caused e.g. improper design of foundations for the given conditions of the construction site or you can not use the material, and it is necessary to replace the more expensive material if necessary or timeconsuming process with other materials. These changes may cause unpredictable cost of works.

Metrics

Metrics Loading ...

References

CEEC RESEARCH, s.r.o. Kvartálna analýza Slovenského stavebníctva Q3/2015 - Výskum potenciálu stavebníctva v krajinách strednej Európy. [Online] 30. 9 2015. Available at: http://ceec.eu./.

Kvartálna analýza slovenského stavebníctva Q2/2016- Investori - Projektanti - Stavebné firmy. [Online] 2016. Available at: http://www.ceec.eu./.

Kvartální analýza českého stavebnictví Q3/2015. [Online] 10. 9 2015. Available at: http://www.ceec.eu/.

Čavojský, J. Oceňovanie stavebných prác (klasifikácie, kalkulovanie, oceňovanie a rozpočtovanie). Bratislava : Cenekon spo. s.r.o., 2012. ISBN 978-80-970678-1-6.

Cenekon spol. s.r.o. Pravidlá pre používanie Smerných orientačných oceňovacích a kalkulačných nástrojov (SON). 2016 .

Technická univerzita v Košiciach. Testovanie hypotéz. [Online] 2011. Available at: http://www.fberg.tuke.sk/.

Bedáňová, I. Statistika a výpočetní technika. [Online] 2013. Available at: http://cit.vfu.cz/statpotr/index.htm.

Downloads

Published

2016-12-31

How to Cite

Ďubek, S. and Ďubek, M. (2016) “THE UNPREDICTABLE COSTS PART OF CONSTRUCTION”, Czech Journal of Civil Engineering, 2(2), pp. 42-47. vailable at: https://cjce.cz/journal/article/view/87 (ccessed: 21November2024).

Issue

Section

Articles