MONITORING OF BUILDINGS – MONITORING LIFTING MECHANISMS

Authors

  • Jiří Šťastný Brno University of Technology, Faculty of Civil Engineering, Veveří 331/95, 602 00 Brno, Czech Republic
  • Vít Motyčka Brno University of Technology, Faculty of Civil Engineering, Veveří 331/95, 602 00 Brno, Czech Republic
  • Rostislav Doubek Brno University of Technology, Faculty of Civil Engineering, Veveří 331/95, 602 00 Brno, Czech Republic
  • Michal Brandtner Brno University of Technology, Faculty of Civil Engineering, Veveří 331/95, 602 00 Brno, Czech Republic
  • Lukáš Bříza Brno University of Technology, Faculty of Civil Engineering, Veveří 331/95, 602 00 Brno, Czech Republic

DOI:

https://doi.org/10.51704/cjce.2018.vol4.iss1.pp85-92

Keywords:

Monitoring, construction, process, timing, cycle, crane, tower crane

Abstract

The lifting means are very important during construction process. The efficient use of lifting means can lead to the completion of the construction schedule. The lifting means is used inefficiently, which leads to downtime or the lifting means do not cover the required number of processes. The article deals with the collection of data from the use of lifting means during the entire construction. Measured data will be the basis of a simulation model that will allow to assess the time load of tower cranes.

Metrics

Metrics Loading ...

References

ĎUBEK, M., MAKÝŠ, P. Technologický pohľad na dopady dočasného zastavenia prác na stavbe. In Almanach znalca [elektronický zdroj]. Roč. 15, č. 1-2 (2015), CD-ROM, s. 29-31. ISSN 1336-3174.

ĎUBEK, M., MAKÝŠ, P. Harmonogramy v stavebníctve a podklady k ich tvorbe. In Buildustry [elektronický zdroj]. Roč. 1, č. 1 (2017), CD-ROM, s. 25-28. ISSN 2454-0382.

MOTYČKA, V., KLEMPA, L. Scheduling of tower cranes on construction sites,kapitola v Advances and Trends in Engineering Sciences and Technologies III, Taylor and Francis Group, London, 2016, pp.567-573, ISBN 978-1-138-03224-8.

MOTYČKA, V., KLEMPA, L. Efficiency of tower cranes,ESaT 2016 2nd International Conference on Engineering Scences and Technologies, Technical University of Košice, Košice 2016, pp.83-87, ISBN 978-80-553-2564-4.

MOTYČKA, V., KLEMPA, L. Simulation model of tower crane work, In Sborník příspěvků mezinárodní vědecké konference CTM 2014, PROCEEDINGS, STU Bratislava, 2014, pp.346-352, ISBN: 978-80-227-4243-6.

ZHANG, P., et al., Location optimization for a group of tower cranes. Journal of construction engineering and management, 1999, 125(2), s. 115-122. DOI: https://doi.org/10.1061/(ASCE)0733-9364(1999)125:2(115)

Published

2018-06-30

How to Cite

Šťastný, J., Motyčka, V., Doubek, R., Brandtner, M. and Bříza, L. (2018) “MONITORING OF BUILDINGS – MONITORING LIFTING MECHANISMS”, Czech Journal of Civil Engineering, 4(1), pp. 85-92. doi: 10.51704/cjce.2018.vol4.iss1.pp85-92.

Issue

Section

Articles

Most read articles by the same author(s)