BIM IMPLEMENTATION INTO FACILITY MANAGEMENT – CASE STUDY FOR LARGE COMPANY IN THE CZECH REPUBLIC

Authors

  • Václav Venkrbec Brno University of Technology, Faculty of Civil Engineering, Veveří 331/95, 602 00 Brno, Czech Republic
  • Michal Brandtner Brno University of Technology, Faculty of Civil Engineering, Veveří 331/95, 602 00 Brno, Czech Republic

DOI:

https://doi.org/10.51704/cjce.2021.vol7.iss01.pp44-62

Keywords:

Facility management, FM, Building information management, BIM, building life cycle, 6D, SMART, PESTLE, Porter's model, SWOT, GAP analysis, gantt chart, resource & cost analysis, big company, project management, implementation

Abstract

Facility management (FM) plays a relatively significant role in the construction life cycle. The quality of FM implementation is key to the lifetime costs of a company's buildings. Most of the operational costs are already decided upon in the building design phase. The low quality and variability of projects has the greatest impact on the efficiency of operation and thus on FM services. The operation of buildings thus becomes more expensive, more complicated, and thus more prone to malfunctions. This article deals with the synthesis process of building information management (BIM) and FM for large commercial and manufacturing companies with more than 250 employees using EN ISO 41011. The use of the BIM method, or rather the creation of a 6D model of the building, can be an effective way of beginning the management of the building within its life cycle. The presented case study evaluates the application of BIM using SMART-based project management tools such as GAP analysis, Gantt chart, Resource & Costs analysis, PESTLE analysis, Porter's 5 forces model and SWOT analysis. The above-mentioned analyses present materially, technically, and critically all areas and aspects of implementation such as financial, time and human resources. Furthermore, possible risks, strengths, and weaknesses as well as challenges and threats and other related factors such as political, legislative, technical, technological, security and others are determined. It was found that the benefits in the form of non-negligible savings in operation and maintenance outweigh the risks in the form of possible project failure.

Metrics

Metrics Loading ...

References

ZUBROVÁ, Tereza. Možnosti zavedení Facility managementu do prostředí organizací řízených územně samosprávním celkem [online]. B.m., 2019. ČVUT v Praze, Fakulta stavební. Dostupné z: https://dspace.cvut.cz/handle/10467/81125

KUDA, František, Eva BERÁNKOVÁ a Petr SOUKUP. Facility management v kostce pro profesionály i laiky. Olomouc: Form Solution, 2012. ISBN 978-80-905257-0-2.

ÚNMZ. ČSN EN ISO 41011 - Facility management - Slovník. B.m.: Úřad pro technickou normalizaci, metrologii a státní zkušebnictví. 2018

ISIKDAG, Umit, Jason UNDERWOOD a Murat KURUOGLU. Building Information Modelling [online]. 2012. ISBN 9781405156486. Dostupné z: doi: https://doi.org/10.1002/9781118280294.ch17

ALANI, Yasir, Atif HAFEEZ, Sergio RODRIGUEZ, Mian ATIF HAFEEZ, Joao PATACAS a Nashwan DAWOOD. An Exploration of the Owner’s Requirements for BIM in Facilities Management. In: CIB World Building Congress. 2019.

AZZRAN, S. A., K. F. IBRAHIM, Joseph H.M. TAH a F. Henry ABANDA. Assessment of open BIM standards for facilities management. In: Innovative Production And Construction: Transforming Construction Through Emerging Technologies [online]. 2019. Dostupné z: doi: https://doi.org/10.1142/9789813272491_0015

VENKRBEC, Václav, Mario GALIĆ a Uroš KLANŠEK. Construction process optimisation – review of methods, tools and applications. Građevinar [online]. 2018, 70(07), 593–606. ISSN 03502465. Dostupné z: doi: https://doi.org/10.14256/JCE.1719.2016

MÉSÁROŠ, Peter, Jana SMETANKOVÁ, Tomáš MANDIČÁK a Eva KRÍDLOVÁ-BURDOVÁ. Implication of BIM on selected aspects of sustainability. IOP Conference Series: Earth and Environmental Science [online]. 2021, 656(1), 012005. ISSN 1755-1307. Dostupné z: doi: https://doi.org/10.1088/1755-1315/656/1/012005

CAD STUDIO S.R.O. BIM manažer. BIMFO [online]. 2021 [vid. 2021-05-02]. Dostupné z: https://www.bimfo.cz/Nastaveni/Slovnik-BIM-pojmu/BIM-manazer.aspx

GNANAREDNAM, Mehala a Himal Suranga JAYASENA. Ability of BIM to Satisfy CAFM Information Requirements. In: The Second World Construction Symposium 2013: Socio-Economic Sustainability in Construction. 2013.

DASOVIĆ, Borna, Mario GALIĆ a Uroš KLANŠEK. Active BIM approach to optimize work facilities and tower crane locations on construction sites with repetitive operations. Buildings [online]. 2019. ISSN 20755309. Dostupné z: doi: https://doi.org/10.3390/buildings9010021

ARIANSYAH, Dedy, Francesco ROSA a Giorgio COLOMBO. Smart maintenance: A wearable augmented reality application integrated with CMMS to minimize unscheduled downtime. Computer-Aided Design and Applications [online]. 2020, 17(4). ISSN 16864360. Dostupné z: doi: https://doi.org/10.14733/cadaps.2020.740-751

ČESKÁ AGENTURA PRO STANDARDIZACI. BIM a Facility Management (FM) [online]. 2021 [vid. 2021-05-02]. Dostupné z: https://www.koncepcebim.cz/296-5-6-bim-a-facility-management-fm

PERERA, Rashain. The PESTLE Analysis. The PESTLE Analysis. 2017.

ARIYANTI, Kartika Devi a Alibasjah INGGRIANTARA. PROPOSED BUSINESS STRATEGY FOR SMALL ARCHITECTURE FIRM IN TANGERANG: CASE STUDY TOP HOUSE. Advanced International Journal of Business, Entrepreneurship and SMEs [online]. 2021, 3(10). Dostupné z: doi: https://doi.org/10.35631/aijbes.310005

MÉSÁROŠ, Peter, Tomáš MANDIČÁK, Marcela SPIŠÁKOVÁ, Annamária BEHÚNOVÁ a Marcel BEHÚN. The Implementation Factors of Information and Communication Technology in the Life Cycle Costs of Buildings. Applied Sciences [online]. 2021, 11(7), 2934. ISSN 2076-3417. Dostupné z: doi: https://doi.org/10.3390/app11072934

MINISTERSTVO PRŮMYSLU A OBCHODU ČR. Koncepce zavádění BIM v ČR [online]. 2017. Dostupné z: https://www.mpo.cz/assets/cz/stavebnictvi-a-suroviny/bim/2017/10/Koncepce-zavadeni-metody-BIM-v-CR.pdf

ÚŘAD VLÁDY ČR. Digitalizace. The Country for the future [online]. 2019 [vid. 2021-05-02]. Dostupné z: https://www.countryforfuture.com/pilir/digitalization/

EVROPSKÁ KOMISE. Zelená dohoda pro Evropu [online]. 2019. Dostupné z: https://eur-lex.europa.eu/resource.html?uri=cellar:b828d165-1c22-11ea-8c1f-01aa75ed71a1.0010.02/DOC_1&format=PDF

MINISTERSTVO PRO MÍSTNÍ ROZVOJ ČR. Rekodifikace veřejného stavebního práva, Informace o hlavních směrech a cílech rekodifikace [online]. 2018. Dostupné z: https://www.mmr.cz/getattachment/4de08365-c4ce-4922-af1e-91d518b03a02/attachment.aspx

SYNEK, Jiří. Datový standard informačního modelu. Časopis stavebnictví. 2020, 05. Dostupné z: https://www.casopisstavebnictvi.cz/clanky-datovy-standard-informacniho-modelu.html

Published

2021-07-31

How to Cite

Venkrbec, V. and Brandtner, M. (2021) “BIM IMPLEMENTATION INTO FACILITY MANAGEMENT – CASE STUDY FOR LARGE COMPANY IN THE CZECH REPUBLIC”, Czech Journal of Civil Engineering, 7(01), pp. 44-62. doi: 10.51704/cjce.2021.vol7.iss01.pp44-62.

Issue

Section

Articles

Most read articles by the same author(s)

1 2 > >>